Here’s our full report on Denison Mines, $DNN.
Denison owns 95% of Phoenix at Wheeler River in Saskatchewan’s Athabasca Basin, the highest-grade undeveloped uranium deposit in the world. Construction started this year, with first production targeted for late 2028.
What’s inside
The orebody: grade, cost and mine life
The build and the balance sheet: how construction is funded, and what changed this year.
The mining method: Phoenix is the first in-situ recovery mine attempted on a deposit like this. What the field test showed, what it didn’t, and the conventional alternative next door.
Sector criteria: the six lenses we apply to uranium developers.
Valuation as conditional arithmetic: net asset value and projected cash flow at the uranium price and discount rate you choose, with scenarios for when things don’t go to plan.
Risk register: the uranium price, execution, the convertible notes, the method at scale, mine life and the discount rate.